Archives

STEPHENS AVENUE

STEPHENS AVENUE

PCI engineering CTEP Stephens Ave

PROJECT OVERVIEW

Stephens Avenue Landscaping Project was a project funded by the Montana Department of Transportation, Community Transportation Enhancement Program for the City of Missoula. The project included reconstruction of 3,600 lineal feet of Stephens Avenue from Northeast of Knowles Street to South Sixth Street intersection. A new landscaped center island with street lighting was a highlight of the project. Intersections were designed with bulb-outs for traffic calming.

 

 

Project Type:
Municipal Road Improvements CTEP

Project Location:
Missoula, Montana

Client:
City of Missoula

Engineer:
Professional Consultants, Inc.

Project Value:
$800,000

Project Team:
Tom Hanson –
Project Engineer
Mike Mieyr – Staff Engineer

 

MULLAN ROAD INTERCEPTOR

MULLAN ROAD INTERCEPTOR

image_municpal_mullanroad

Project Overview:

Lolo Creek Trails is a 92 lot residential subdivision along Highway 12 in Lolo, Montana. The project had two phases of development with the first phase consisting of 5,300 lineal feet of roadways, 4,700 lineal feet of sewer mains and 5,700 lineal feet of water mains. Phase II consists of extending the water and sewer mains along Highway 12 to connect into the existing Lolo Water and Sewer District mains. Work consisted of installing 860 lineal feet of sewer force main, 7,500 lineal feet of sewer mains and 4,000 lineal feet of water mains.

 

 

Project Type:
Municipal Water, Subdivision and Sewer Extension & Lift Station

Project Location:
Lolo, Montana

Client:
Mustang Holdings

Engineer:
Professional Consultants, Inc.

Project Value:
$2.5 Million

Project Team:
Andy Mefford / Project Engineer

Project Reference:
Greg Robertson / Public Works Director / 406-258-4753

 

Lolo Creek Trails 2005

Lolo Creek Trails 2005

PCI Engineering--Lolo Creek Trails

Project Overview:
Lolo Creek Trails is a 92-lot residential subdivision along Highway 12 in Lolo, Montana. The project had two phases of development with the first phase consisting of 5,300 lineal feet of roadways, 4,700 lineal feet of sewer mains and 5,700 lineal feet of water mains. Phase II consists of extending the water and sewer mains along Highway 12 to connect into the existing Lolo Water and Sewer District mains. Work consisted of installing 860 lineal feet of sewer force main, 7,500 lineal feet of sewer mains and 4,000 lineal feet of water mains.

 

Project Type:
Municipal Water, Subdivision and Sewer Extension & Lift Station

Project Location:
Lolo, Montana

Client:
Mustang Holdings

Engineer:
Professional Consultants, Inc.

Project Value:
$2.5 Million

Project Team:
Andy Mefford / Project Engineer

Project Reference:
Greg Robertson / Public Works Director / 406-258-4753

 

Plains, MT Wastewater Treatment Plant

TOWN OF PLAINS WASTEWATER TREATMENT PLANT 2004

PCI Engineering--Plains Wastewater Treatment Plant

Project Overview:

Constructed three aerated lagoons and one polising pond. Project included pumping out the existing sludge from the sewer lagoons and land applying the sludge to neighboring agricultural land. New headworks was constructed with slide gates and new telescoping valves were designed for process control of the wastewater plant. The effluent discharge was contracted with a new outfall structure on the banks of the Clark Fork River.

 

Project Type:
Municipal

Project Location:
Plains, Montana

Client:
Town of Plains

Engineer:
Professional Consultants, Inc.

Project Value:
2004 – $900,000

 

COMMUNITY MEDICAL CENTER

COMMUNITY MEDICAL CENTER 1994-1999

PCI Engineerging--Community Medical Lift Station

Project Overview:

PCI has worked on several projects on the Community Medical Center Campus including the gravity sewer and lift station project. This project consisted of 2200 LF of 8” and 10” gravity sewer and upgrading the dry-well lift station to an above ground submersible pump system.

This lift station upgrade for this project was similar to the proposed upgrades to the Dickens Street and East Broadway lift stations.

 

 

Project Type:
Sewer Main Extension & Lift Station

Project Location:
Missoula, Montana

Client:
Community Medical Center

Engineer:
Professional Consultants, Inc.

Project Team:
Tom Hanson – Project Manager